From NEOM mega-projects and PIF-backed facilities to government ministry buildings, military housing compounds, industrial power plant works, and city-scale infrastructure — 20+ years of engineering delivery across the Kingdom of Saudi Arabia.

● Active & Completed

Recent Projects

SAR 28 Million total contract value · All Prime Contractor

 Portfolio: SAR 28,000,000

SAR 11M

Completed

Building · Renovation
Golf Saudi · Public Investment Fund (PIF)
Golf Saudi Co. Clubhouse Renovation

Overview: Golf Saudi Clubhouse is a two-story building of approximately total built-up area of 4,000m² .
The scope of work includes civil, architectural, mechanical and electrical works.

Built-Up Area

~4,000 m²

Location

Riyadh, KSA

Duration

2024 – 2026

Contract Value

SAR 11,000,000

Prime Contractor

Completed

SAR 5M

Turnkey Projects
Gulf Saudi
Gulf Saudi Tech Warehouse

Overview: Gulf Saudi Tech Warehouse of a total built-up area of 1,500m² and land area 2,500m². The scope of work is turnkey project including civil, architectural, mechanical, electrical and external site works.

Built-Up Area

1,500 m²

Land Area

2,500 m²

Duration

2025 – 2026

Contract Value

SAR 5,000,000

Prime Contractor

SAR 12M

Active

Turnkey Projects
Delta Saudi Chemicals Co.
Delta Saudi Chemicals Warehouse — Modon Industrial City

Overview: Delta Saudi Chemicals Warehouse (High Risk materials) of a total built-up area of 4,000m² and land area of 6,500m² .
The scope of work is turnkey project including civil, architectural, mechanical, electrical and external site works.

Built-Up Area

~4,000 m²

Land Area

6,500 m²

Location

Al-Kharj, KSA

Contract Value

SAR 12,000,000

Prime Contractor
✓ Delivered

Completed Projects

22 projects across 5 sectors · SAR 167M+ total delivered value · 2009 – 2024

Active Portfolio: SAR 167M+

Buildings

2 projects

Sector Total: SAR 111.4M

SAR 15.3M

Subcontractor
UNEC Co. / Awtad Real Estate
Al-Majdoul Tower

Overview: Al-Majdoul Tower is a commercial twisted skyscraper in the King Fahd District of Riyadh, Saudi Arabia. With a height of 244 meters.
The scope of works included all Civil works.
Civil Works:- Excavation, concrete and skeleton work.

2012 – 2014

Riyadh-KSA

244m Height

SAR 25.2M

Prime Contractor
Military Industries — Saudi Government
Military Industries Housing Compound

Overview: Constructing of 160 villas with a total built-up area of 40,000 m2, including all civil, finishing, MEP and Testing & commissioning.
UMNIAH Scope of works included :
- All Civil works & skeleton package
- External and internal finishes and fit-out.
- All MEP systems supply, install and testing & commissioning
- All external works and utilities, including landscape works

2009 - 2012

160 Villas

40,000 m²

Housing Compounds of Military Industries

2 projects

Sector Total: SAR 22M

SAR 6M

Prime Contractor
General S. Al-Rasheed
Private Villas — General S. Al-Rasheed

Overview: Constructing villas with swimming pools, gardens, servant quarter, external works and landscaping including all civil, finishing, MEP and Testing & commissioning works.
UMNIAH Scope of works included :
- All Civil works & skeleton package
- External and internal finishes and fit-out.
- All MEP systems supply, install and testing & commissioning
- All external works and utilities, including landscape works

2006-2007

Riyadh-KSA

Luxury

SAR 16M

Prime Contractor
Ministry of Health — Saudi Government
Ministry of Health Primary Clinics

Overview: Constructing of primary clinics for Ministry of Health, including all civil, finishing, MEP and Testing & commissioning.
UMNIAH Scope of works included:
- All Civil works & skeleton package
- External and internal finishes and fit-out.
- All MEP systems supply, install and testing & commissioning
- All external works and utilities, including landscape works

2010 - 2013

Government

Healthcare

Steel Structure Buildings

1 projects

Sector Total: SAR 23M

Contract: SAR 23M

Prime Contractor
NEOM
NEOM Trojena Operational Facilities

Overview: NEOM Trojena Operational Facilities Warehouses of a total built-up area of 15,000 m² containing 5 Buildings.
The scope of work is turnkey project including civil, steel structure and architectural works.

2022 - 2023

Trojena-KSA

15,000 m²

Golf Saudi (PIF)

3 projects

Sector Total: SAR 10.3M

SAR 4.82M

Prime Contractor
Golf Saudi · Public Investment Fund (PIF)
Golf Saudi Fit-Out Renovation

Full interior fit-out and renovation of Golf Saudi facilities — architectural, MEP, and finishing works.

2023–2024

Renovation

SAR 3.73M

Prime Contractor
Golf Saudi · Public Investment Fund (PIF)
Golf Saudi Fire Fighting System

Complete fire fighting system installation across Golf Saudi facilities — supply, installation, testing, and commissioning.

2024

MEP · Fire

SAR 1.72M

Prime Contractor
Golf Saudi · Public Investment Fund (PIF)
Golf Saudi Tank Works

Civil and structural works for water tank construction at Golf Saudi facilities — part of ongoing site infrastructure development.

2024

Civil

Civil & Infrastructure

2 projects

Sector Total: SAR 29M

SAR 20M

Prime Contractor
Al-Rawaf Contracting
Al-Asalah District Infrastructure Works

The project involves the installation of approximately 7,000 m of sanitary sewer, 10,000 m of firefighting pipes, and 14,000 m of irrigation networks, including all associated excavation, pipe laying, and reinstatement works to meet applicable standards.

2024–2025

31,000m Networks

Riyadh, KSA

SAR 9M

Prime Contractor
Al-Ojaimi Contracting
Sela Project — Green Phase Infrastructure

The project involves the installation of sanitary sewer, Water network, Fire network , irrigation network, including all associated excavation, pipe laying, and reinstatement works to meet applicable standards.

2024–2025

4 Networks

Johfa, KSA

Industrial Projects

1 projects

Sector Total: SAR 17M

SAR 17M

Subcontractor
Al-Meem United Co.
Jeddah South Thermal Power Plant — Fuel Tanks Field

Key Figures: • 28 silos, 47m high • 100,000 MT of grain storage facility
Overview: EPC Contract - JV with Al-Haif Company KSA
• Additional individual 28 silos of 3,600 MT each),with internal diameter of each silo 13m and a height approximately 47m, including cone and roof.
• Head house Expansion
• Reversible belt Conveyor
• Combined ship loader/unloader #3

2013–2015

EPC Contract

Jeddah, KSA

MEP / Electromechanical

2 projects

Sector Total: SAR 10.5M

SAR 6.35M

Subcontractor
Ministry of Defence — Saudi Government
Ministry of Defence Electromechanical Works

Complete electromechanical systems installation for Ministry of Defence facilities — electrical, telecom, fire fighting, HVAC, and plumbing systems across multiple government buildings.

2016–2019

Government

Defence

SAR 4.2M

Subcontractor
JAWDAT Co.
Diyar Aljazeera Electromechanical Works

Full electromechanical systems package for the Diyar Aljazeera development — electrical, fire fighting, HVAC, plumbing, and telecom infrastructure.

2014–2016

MEP Systems

✓ Delivered

Completed Projects

22 projects across 5 sectors · SAR 167M+ total delivered value · 2009 – 2024

Active Portfolio: SAR 167M+

Buildings

2 projects

Sector Total: SAR 111.4M

SAR 15.3M

Subcontractor
UNEC Co. / Awtad Real Estate
Al-Majdoul Tower

Overview: Al-Majdoul Tower is a commercial twisted skyscraper in the King Fahd District of Riyadh, Saudi Arabia. With a height of 244 meters.
The scope of works included all Civil works.
Civil Works:- Excavation, concrete and skeleton work.

2012 – 2014

Riyadh-KSA

244m Height

SAR 25.2M

Prime Contractor
Military Industries — Saudi Government
Military Industries Housing Compound

Overview: Constructing of 160 villas with a total built-up area of 40,000 m2, including all civil, finishing, MEP and Testing & commissioning.
UMNIAH Scope of works included :
- All Civil works & skeleton package
- External and internal finishes and fit-out.
- All MEP systems supply, install and testing & commissioning
- All external works and utilities, including landscape works

2009 - 2012

160 Villas

40,000 m²

Housing Compounds of Military Industries

2 projects

Sector Total: SAR 22M

SAR 6M

Prime Contractor
General S. Al-Rasheed
Private Villas — General S. Al-Rasheed

Overview: Constructing villas with swimming pools, gardens, servant quarter, external works and landscaping including all civil, finishing, MEP and Testing & commissioning works.
UMNIAH Scope of works included :
- All Civil works & skeleton package
- External and internal finishes and fit-out.
- All MEP systems supply, install and testing & commissioning
- All external works and utilities, including landscape works

2006-2007

Riyadh-KSA

Luxury

SAR 16M

Prime Contractor
Ministry of Health — Saudi Government
Ministry of Health Primary Clinics

Overview: Constructing of primary clinics for Ministry of Health, including all civil, finishing, MEP and Testing & commissioning.
UMNIAH Scope of works included:
- All Civil works & skeleton package
- External and internal finishes and fit-out.
- All MEP systems supply, install and testing & commissioning
- All external works and utilities, including landscape works

2010 - 2013

Government

Healthcare

Steel Structure Buildings

1 projects

Sector Total: SAR 23M

Contract: SAR 23M

Prime Contractor
NEOM
NEOM Trojena Operational Facilities

Overview: NEOM Trojena Operational Facilities Warehouses of a total built-up area of 15,000 m² containing 5 Buildings.
The scope of work is turnkey project including civil, steel structure and architectural works.

2022 - 2023

Trojena-KSA

15,000 m²

✓ Delivered

Completed Projects

22 projects across 5 sectors · SAR 167M+ total delivered value · 2009 – 2024

Active Portfolio: SAR 167M+

Golf Saudi (PIF)

3 projects

Sector Total: SAR 10.3M

SAR 4.82M

Prime Contractor
Golf Saudi · Public Investment Fund (PIF)
Golf Saudi Fit-Out Renovation

Full interior fit-out and renovation of Golf Saudi facilities — architectural, MEP, and finishing works.

2023–2024

Renovation

SAR 3.73M

Prime Contractor
Golf Saudi · Public Investment Fund (PIF)
Golf Saudi Fire Fighting System

Complete fire fighting system installation across Golf Saudi facilities — supply, installation, testing, and commissioning.

2024

MEP · Fire

SAR 1.72M

Prime Contractor
Golf Saudi · Public Investment Fund (PIF)
Golf Saudi Tank Works

Civil and structural works for water tank construction at Golf Saudi facilities — part of ongoing site infrastructure development.

2024

Civil

✓ Delivered

Completed Projects

22 projects across 5 sectors · SAR 167M+ total delivered value · 2009 – 2024

Active Portfolio: SAR 167M+

Civil & Infrastructure

2 projects

Sector Total: SAR 29M

SAR 20M

Prime Contractor
Al-Rawaf Contracting
Al-Asalah District Infrastructure Works

The project involves the installation of approximately 7,000 m of sanitary sewer, 10,000 m of firefighting pipes, and 14,000 m of irrigation networks, including all associated excavation, pipe laying, and reinstatement works to meet applicable standards.

2024–2025

31,000m Networks

Riyadh, KSA

SAR 9M

Prime Contractor
Al-Ojaimi Contracting
Sela Project — Green Phase Infrastructure

The project involves the installation of sanitary sewer, Water network, Fire network , irrigation network, including all associated excavation, pipe laying, and reinstatement works to meet applicable standards.

2024–2025

4 Networks

Johfa, KSA

✓ Delivered

Completed Projects

22 projects across 5 sectors · SAR 167M+ total delivered value · 2009 – 2024

Active Portfolio: SAR 167M+

Industrial Projects

1 projects

Sector Total: SAR 17M

SAR 17M

Subcontractor
Al-Meem United Co.
Jeddah South Thermal Power Plant — Fuel Tanks Field

Key Figures: • 28 silos, 47m high • 100,000 MT of grain storage facility
Overview: EPC Contract - JV with Al-Haif Company KSA
• Additional individual 28 silos of 3,600 MT each),with internal diameter of each silo 13m and a height approximately 47m, including cone and roof.
• Head house Expansion
• Reversible belt Conveyor
• Combined ship loader/unloader #3

2013–2015

EPC Contract

Jeddah, KSA

✓ Delivered

Completed Projects

22 projects across 5 sectors · SAR 167M+ total delivered value · 2009 – 2024

Active Portfolio: SAR 167M+

MEP / Electromechanical

2 projects

Sector Total: SAR 10.5M

SAR 6.35M

Subcontractor
Ministry of Defence — Saudi Government
Ministry of Defence Electromechanical Works

Complete electromechanical systems installation for Ministry of Defence facilities — electrical, telecom, fire fighting, HVAC, and plumbing systems across multiple government buildings.

2016–2019

Government

Defence

SAR 4.2M

Subcontractor
JAWDAT Co.
Diyar Aljazeera Electromechanical Works

Full electromechanical systems package for the Diyar Aljazeera development — electrical, fire fighting, HVAC, plumbing, and telecom infrastructure.

2014–2016

MEP Systems

● Active & Completed

Recent Projects

SAR 28 Million total contract value · All Prime Contractor

 Portfolio: SAR 28,000,000

SAR 11M

Completed

Building · Renovation
Golf Saudi · Public Investment Fund (PIF)
Golf Saudi Co. Clubhouse Renovation

Overview: Golf Saudi Clubhouse is a two-story building of approximately total built-up area of 4,000m² .
The scope of work includes civil, architectural, mechanical and electrical works.

Built-Up Area

~4,000 m²

Location

Riyadh, KSA

Duration

2024 – 2026

Contract Value

SAR 11,000,000

Prime Contractor

Completed

SAR 5M

Turnkey Projects
Gulf Saudi
Gulf Saudi Tech Warehouse

Overview: Gulf Saudi Tech Warehouse of a total built-up area of 1,500m² and land area 2,500m². The scope of work is turnkey project including civil, architectural, mechanical, electrical and external site works.

Built-Up Area

1,500 m²

Land Area

2,500 m²

Duration

2025 – 2026

Contract Value

SAR 5,000,000

Prime Contractor

SAR 12M

Active

Turnkey Projects
Delta Saudi Chemicals Co.
Delta Saudi Chemicals Warehouse — Modon Industrial City

Overview: Delta Saudi Chemicals Warehouse (High Risk materials) of a total built-up area of 4,000m² and land area of 6,500m² .
The scope of work is turnkey project including civil, architectural, mechanical, electrical and external site works.

Built-Up Area

~4,000 m²

Land Area

6,500 m²

Location

Al-Kharj, KSA

Contract Value

SAR 12,000,000

Prime Contractor
✓ Delivered

Completed Projects

22 projects across 5 sectors · SAR 167M+ total delivered value · 2009 – 2024

Active Portfolio: SAR 167M+

Buildings

2 projects

Sector Total: SAR 111.4M

SAR 15.3M

Subcontractor
UNEC Co. / Awtad Real Estate
Al-Majdoul Tower

Overview: Al-Majdoul Tower is a commercial twisted skyscraper in the King Fahd District of Riyadh, Saudi Arabia. With a height of 244 meters.
The scope of works included all Civil works.
Civil Works:- Excavation, concrete and skeleton work.

2012 – 2014

Riyadh-KSA

244m Height

SAR 25.2M

Prime Contractor
Military Industries — Saudi Government
Military Industries Housing Compound

Overview: Constructing of 160 villas with a total built-up area of 40,000 m2, including all civil, finishing, MEP and Testing & commissioning.
UMNIAH Scope of works included :
- All Civil works & skeleton package
- External and internal finishes and fit-out.
- All MEP systems supply, install and testing & commissioning
- All external works and utilities, including landscape works

2009 - 2012

160 Villas

40,000 m²

Housing Compounds of Military Industries

2 projects

Sector Total: SAR 22M

SAR 6M

Prime Contractor
General S. Al-Rasheed
Private Villas — General S. Al-Rasheed

Overview: Constructing villas with swimming pools, gardens, servant quarter, external works and landscaping including all civil, finishing, MEP and Testing & commissioning works.
UMNIAH Scope of works included :
- All Civil works & skeleton package
- External and internal finishes and fit-out.
- All MEP systems supply, install and testing & commissioning
- All external works and utilities, including landscape works

2006-2007

Riyadh-KSA

Luxury

SAR 16M

Prime Contractor
Ministry of Health — Saudi Government
Ministry of Health Primary Clinics

Overview: Constructing of primary clinics for Ministry of Health, including all civil, finishing, MEP and Testing & commissioning.
UMNIAH Scope of works included:
- All Civil works & skeleton package
- External and internal finishes and fit-out.
- All MEP systems supply, install and testing & commissioning
- All external works and utilities, including landscape works

2010 - 2013

Government

Healthcare

Steel Structure Buildings

1 projects

Sector Total: SAR 23M

Contract: SAR 23M

Prime Contractor
NEOM
NEOM Trojena Operational Facilities

Overview: NEOM Trojena Operational Facilities Warehouses of a total built-up area of 15,000 m² containing 5 Buildings.
The scope of work is turnkey project including civil, steel structure and architectural works.

2022 - 2023

Trojena-KSA

15,000 m²

Golf Saudi (PIF)

3 projects

Sector Total: SAR 10.3M

SAR 4.82M

Prime Contractor
Golf Saudi · Public Investment Fund (PIF)
Golf Saudi Fit-Out Renovation

Full interior fit-out and renovation of Golf Saudi facilities — architectural, MEP, and finishing works.

2023–2024

Renovation

SAR 3.73M

Prime Contractor
Golf Saudi · Public Investment Fund (PIF)
Golf Saudi Fire Fighting System

Complete fire fighting system installation across Golf Saudi facilities — supply, installation, testing, and commissioning.

2024

MEP · Fire

SAR 1.72M

Prime Contractor
Golf Saudi · Public Investment Fund (PIF)
Golf Saudi Tank Works

Civil and structural works for water tank construction at Golf Saudi facilities — part of ongoing site infrastructure development.

2024

Civil

Civil & Infrastructure

2 projects

Sector Total: SAR 29M

SAR 20M

Prime Contractor
Al-Rawaf Contracting
Al-Asalah District Infrastructure Works

The project involves the installation of approximately 7,000 m of sanitary sewer, 10,000 m of firefighting pipes, and 14,000 m of irrigation networks, including all associated excavation, pipe laying, and reinstatement works to meet applicable standards.

2024–2025

31,000m Networks

Riyadh, KSA

SAR 9M

Prime Contractor
Al-Ojaimi Contracting
Sela Project — Green Phase Infrastructure

The project involves the installation of sanitary sewer, Water network, Fire network , irrigation network, including all associated excavation, pipe laying, and reinstatement works to meet applicable standards.

2024–2025

4 Networks

Johfa, KSA

Industrial Projects

1 projects

Sector Total: SAR 17M

SAR 17M

Subcontractor
Al-Meem United Co.
Jeddah South Thermal Power Plant — Fuel Tanks Field

Key Figures: • 28 silos, 47m high • 100,000 MT of grain storage facility
Overview: EPC Contract - JV with Al-Haif Company KSA
• Additional individual 28 silos of 3,600 MT each),with internal diameter of each silo 13m and a height approximately 47m, including cone and roof.
• Head house Expansion
• Reversible belt Conveyor
• Combined ship loader/unloader #3

2013–2015

EPC Contract

Jeddah, KSA

MEP / Electromechanical

2 projects

Sector Total: SAR 10.5M

SAR 6.35M

Subcontractor
Ministry of Defence — Saudi Government
Ministry of Defence Electromechanical Works

Complete electromechanical systems installation for Ministry of Defence facilities — electrical, telecom, fire fighting, HVAC, and plumbing systems across multiple government buildings.

2016–2019

Government

Defence

SAR 4.2M

Subcontractor
JAWDAT Co.
Diyar Aljazeera Electromechanical Works

Full electromechanical systems package for the Diyar Aljazeera development — electrical, fire fighting, HVAC, plumbing, and telecom infrastructure.

2014–2016

MEP Systems

✓ Delivered

Completed Projects

22 projects across 5 sectors · SAR 167M+ total delivered value · 2009 – 2024

Active Portfolio: SAR 167M+

Buildings

2 projects

Sector Total: SAR 111.4M

SAR 15.3M

Subcontractor
UNEC Co. / Awtad Real Estate
Al-Majdoul Tower

Overview: Al-Majdoul Tower is a commercial twisted skyscraper in the King Fahd District of Riyadh, Saudi Arabia. With a height of 244 meters.
The scope of works included all Civil works.
Civil Works:- Excavation, concrete and skeleton work.

2012 – 2014

Riyadh-KSA

244m Height

SAR 25.2M

Prime Contractor
Military Industries — Saudi Government
Military Industries Housing Compound

Overview: Constructing of 160 villas with a total built-up area of 40,000 m2, including all civil, finishing, MEP and Testing & commissioning.
UMNIAH Scope of works included :
- All Civil works & skeleton package
- External and internal finishes and fit-out.
- All MEP systems supply, install and testing & commissioning
- All external works and utilities, including landscape works

2009 - 2012

160 Villas

40,000 m²

Housing Compounds of Military Industries

2 projects

Sector Total: SAR 22M

SAR 6M

Prime Contractor
General S. Al-Rasheed
Private Villas — General S. Al-Rasheed

Overview: Constructing villas with swimming pools, gardens, servant quarter, external works and landscaping including all civil, finishing, MEP and Testing & commissioning works.
UMNIAH Scope of works included :
- All Civil works & skeleton package
- External and internal finishes and fit-out.
- All MEP systems supply, install and testing & commissioning
- All external works and utilities, including landscape works

2006-2007

Riyadh-KSA

Luxury

SAR 16M

Prime Contractor
Ministry of Health — Saudi Government
Ministry of Health Primary Clinics

Overview: Constructing of primary clinics for Ministry of Health, including all civil, finishing, MEP and Testing & commissioning.
UMNIAH Scope of works included:
- All Civil works & skeleton package
- External and internal finishes and fit-out.
- All MEP systems supply, install and testing & commissioning
- All external works and utilities, including landscape works

2010 - 2013

Government

Healthcare

Steel Structure Buildings

1 projects

Sector Total: SAR 23M

Contract: SAR 23M

Prime Contractor
NEOM
NEOM Trojena Operational Facilities

Overview: NEOM Trojena Operational Facilities Warehouses of a total built-up area of 15,000 m² containing 5 Buildings.
The scope of work is turnkey project including civil, steel structure and architectural works.

2022 - 2023

Trojena-KSA

15,000 m²

✓ Delivered

Completed Projects

22 projects across 5 sectors · SAR 167M+ total delivered value · 2009 – 2024

Active Portfolio: SAR 167M+

Golf Saudi (PIF)

3 projects

Sector Total: SAR 10.3M

SAR 4.82M

Prime Contractor
Golf Saudi · Public Investment Fund (PIF)
Golf Saudi Fit-Out Renovation

Full interior fit-out and renovation of Golf Saudi facilities — architectural, MEP, and finishing works.

2023–2024

Renovation

SAR 3.73M

Prime Contractor
Golf Saudi · Public Investment Fund (PIF)
Golf Saudi Fire Fighting System

Complete fire fighting system installation across Golf Saudi facilities — supply, installation, testing, and commissioning.

2024

MEP · Fire

SAR 1.72M

Prime Contractor
Golf Saudi · Public Investment Fund (PIF)
Golf Saudi Tank Works

Civil and structural works for water tank construction at Golf Saudi facilities — part of ongoing site infrastructure development.

2024

Civil

✓ Delivered

Completed Projects

22 projects across 5 sectors · SAR 167M+ total delivered value · 2009 – 2024

Active Portfolio: SAR 167M+

Civil & Infrastructure

2 projects

Sector Total: SAR 29M

SAR 20M

Prime Contractor
Al-Rawaf Contracting
Al-Asalah District Infrastructure Works

The project involves the installation of approximately 7,000 m of sanitary sewer, 10,000 m of firefighting pipes, and 14,000 m of irrigation networks, including all associated excavation, pipe laying, and reinstatement works to meet applicable standards.

2024–2025

31,000m Networks

Riyadh, KSA

SAR 9M

Prime Contractor
Al-Ojaimi Contracting
Sela Project — Green Phase Infrastructure

The project involves the installation of sanitary sewer, Water network, Fire network , irrigation network, including all associated excavation, pipe laying, and reinstatement works to meet applicable standards.

2024–2025

4 Networks

Johfa, KSA

✓ Delivered

Completed Projects

22 projects across 5 sectors · SAR 167M+ total delivered value · 2009 – 2024

Active Portfolio: SAR 167M+

Industrial Projects

1 projects

Sector Total: SAR 17M

SAR 17M

Subcontractor
Al-Meem United Co.
Jeddah South Thermal Power Plant — Fuel Tanks Field

Key Figures: • 28 silos, 47m high • 100,000 MT of grain storage facility
Overview: EPC Contract - JV with Al-Haif Company KSA
• Additional individual 28 silos of 3,600 MT each),with internal diameter of each silo 13m and a height approximately 47m, including cone and roof.
• Head house Expansion
• Reversible belt Conveyor
• Combined ship loader/unloader #3

2013–2015

EPC Contract

Jeddah, KSA

✓ Delivered

Completed Projects

22 projects across 5 sectors · SAR 167M+ total delivered value · 2009 – 2024

Active Portfolio: SAR 167M+

MEP / Electromechanical

2 projects

Sector Total: SAR 10.5M

SAR 6.35M

Subcontractor
Ministry of Defence — Saudi Government
Ministry of Defence Electromechanical Works

Complete electromechanical systems installation for Ministry of Defence facilities — electrical, telecom, fire fighting, HVAC, and plumbing systems across multiple government buildings.

2016–2019

Government

Defence

SAR 4.2M

Subcontractor
JAWDAT Co.
Diyar Aljazeera Electromechanical Works

Full electromechanical systems package for the Diyar Aljazeera development — electrical, fire fighting, HVAC, plumbing, and telecom infrastructure.

2014–2016

MEP Systems

Portfolio at a Glance

30 Years of Measurable Delivery Across Saudi Arabia

50+

Total Projects
(Completed + Active)

SAR 195M+

Total Portfolio Value
(All Projects)

5

Sectors Covered
Buildings · Infra · MEP · Industrial · FM

12

Distinct Clients
Served Across KSA

40,000 m²

Largest Single Project
Military Industries Compound

Have a Project in KSA ?
Let's Build It Together.

Whether you're a government entity, a PIF-linked developer, or a private sector client — Umniah Contracting brings 20+ years of Saudi construction expertise and a proven delivery track record to your project.